Project desk

Bring us the unresolved specification questions

Share the application, project stage and current luminaire schedule. We will route the inquiry toward photometric resources, control compatibility, product selection or installation coordination.

Signify lighting project support office map

Specification support office

Address
High Tech Campus 48, 5656 AE Eindhoven, Netherlands

Email
[email protected]

Telephone
+31 20 555 0197

Hours
Monday–Friday, 08:30–17:30 CET

Professional channel
LinkedIn: Signify Specification Desk

Response timing depends on project complexity and file availability. Please identify the market and exact product configuration when certification scope matters.

What helps us route the inquiry

For a photometric question, include room geometry, mounting height, task plane, target illuminance, surface reflectance assumptions and any UGR objective. Name the optic and output package if a candidate family is already on the schedule. These inputs let the project desk distinguish a file request from an application review.

For a controls question, describe the proposed interface—such as DALI-2 or 0-10V dimming—the number of zones, sensor intent and the party responsible for commissioning. Driver compatibility cannot be established from the protocol label alone; low-end dimming behavior, emergency integration, wiring topology and control ownership can affect final scope.

For compliance documentation, state the destination market and configuration. UL, CE and RoHS references apply to defined product scopes and cannot be assumed across every optic, driver or regional variant. We do not invent report identifiers or transfer a declaration from a similar family.

Limits of an initial response

An email review can identify missing evidence and plausible next steps, but it does not replace local code review, a complete calculation or on-site commissioning. Photometric results depend on accurate geometry and reflectance. Rated lifetime depends on thermal conditions, switching and driver stress. Where color appearance or glare is critical, a physical mock-up under representative finishes remains the more reliable verification path.

Describe the project context

Include room type, mounting, target criteria, control interface and the decision date. Attachments can be coordinated after the initial reply.